Project 0924

Guide Rail Installation

Rails roughly positioned before shims and alignments. 

 
    

Careful measurements for chemical anchors were required to ensure a straight rail.  A ramp is required, due to the multi-graded concrete floor. 








Back to List



Guide rail, ramp, back stops and charger ready for use.



Tow motor in action, using the rail.