Project 0924
Guide Rail Installation
Rails roughly positioned before shims and alignments.
Careful measurements for chemical anchors were required to ensure a straight rail. A ramp is required, due to the multi-graded concrete floor.

Rails roughly positioned before shims and alignments.
Careful measurements for chemical anchors were required to ensure a straight rail. A ramp is required, due to the multi-graded concrete floor.
Tow motor in action, using the rail.